Zhao Qiming went to Inner Mongolia to carry out business activities and inspect and guide the project work
2024-9-10 20:35:57
On September 10, Zhao Qiming, Chairman held talks with Li Wenzhong,Zhao Zhigang, attended the meeting.
Zhao Qiming expressed his gratitude to Inner Mongolia Energy Group for its trust in the company, reviewed the cooperation history between the two parties, and introduced the advantages of specialized branches, core solar thermal technologies, etc. He said that Inner Mongolia Energy Group is a comprehensive energy investment group that is key supported by the autonomous region. The company will go all out to give full play to the advantages of EPCO in the entire industrial chain, project management, resource integration, etc., and will abide by the spirit of the contract, perform the contract efficiently and execute with high quality to contribute to the development of Inner Mongolia Energy Group. He hopes that the two sides will further deepen the cooperative relationship, expand the space for cooperation, broaden the channels for cooperation, and write a new chapter of win-win cooperation.
Li Wenzhong welcomed Zhao Qiming and his delegation, thanked SEPCOIII for its support for the development of Inner Mongolia Energy Group, and introduced the basic situation and business layout of Inner Mongolia Energy Group. He said that SEPCOIII has outstanding performance and rich experience in the field of engineering construction. It has carried out pragmatic cooperation with Inner Mongolia Energy Group in the energy field and achieved fruitful results. He hopes that the two sides will take this meeting as an opportunity to strengthen exchanges and mutual learning, optimize resource allocation, give play to their respective advantages, work together to promote existing cooperation projects, actively expand future cooperation areas, and help the local economic and social high-quality development.
Inner Mongolia Energy Group Co., Ltd. And SEPCOIII relevant personnel attended the meeting.
During the period, Zhao Qiming went deep into the construction site of the Mengneng Jinshan project and conducted key inspections on the main factory building, boiler, behind-the-furnace areas, etc. He required the project to continue to promote engineering construction, continuously strengthen operating results, and do a good job in talent training. He also had in-depth exchanges with Ma Zhanjun, Secretary of the Party Committee ,Deputy General Manager of Inner Mongolia Energy Group Jinshan Third Thermal Power Co., Ltd., and Li Junyi, Executive Director,Deputy General Manager on project node promotion, equipment supply, collaborative development and other aspects, creating good conditions for the subsequent implementation of the project.